22 January 2019Case Studies

Overview

  • 2 stage bronze pump
  • Diameter 600mm
  • Original condition lasting 6 to 12 months

Redevelopment scope

  • Provide alternative supply with local support
  • Match motor maintenance schedule of 4 years
  • Lead time reduces from OEM 18 months to 6 months

Solution

A Western Australian client had 2 stage bronze pump that was only lasting between 6 – 12 months, far less than the submersible motor which had a maintenance schedule of 4 years. They wanted to improve the pump life cycle in line with that of the submersible motor. We recommended reverse engineering the pump with modifications to materials and hydraulics.

The original components were in very poor condition, however 3D scanning and modelling were employed to generate wax models. Through the lost wax process, these printed models were used to cast in super duplex material. No expensive pattern costs were required.

The improved pump matched the life cycle of the motor, saving the client on downtime and maintenance and replacement costs. The new lead time was 12 months shorter than provided by the OEM.

Corrosion on sea water pump
Corrosion on sea water pump
Wax model of pump impeller
Wax model of pump impeller
Corrosion on sea water pump
Corrosion on sea water pump
Original pump model using scan data
Original pump model using scan data

Discover more mining resources, insights and updates.

View all resources
7D EL Slurry Pump Upgrade

20 March 2026

News

SafeR-Series XP: A New Upgrade Approach for Warman® AH®-Compatible Slurry Pump Fleets

Learn more about SafeR-Series XP: A New Upgrade Approach for Warman® AH®-Compatible Slurry Pump Fleets
EL Retrofit for Warman WRT Configured Wet Ends

16 February 2026

News

Extended Life Upgrade for Pumps Configured with Legacy Wet Ends

Learn more about Extended Life Upgrade for Pumps Configured with Legacy Wet Ends
7d team building

4 September 2025

News

Now Providing Technical Support for Mining Wearhouse

Learn more about Now Providing Technical Support for Mining Wearhouse